China World Technology Medical Equipment Service Group
Win-win together!
| Brand Name: | GE |
| Model Number: | 316696 SBT 00790M 316707 56T 00792M |
| Minimum Order Quantity: | 1 Piece |
|---|---|
| Price: | USD |
| Packaging Details: | Standard Export Packing |
| Delivery Time: | 3-5 working days |
| Payment Terms: | T/T, Western Union, Paypal |
| Supply Ability: | In stock |
| Model: | 316696 SBT 00790M 316707 56T 00792M | Brand: | GE |
|---|---|---|---|
| Product Name: | Grounding Wire Assembly | MOQ: | 1 Set |
| Material: | Plastic | Warranty: | 90 Days |
| Use For: | GE PRO1000 Patient Monitor | Condition: | Used Original |
| Inventory: | In Stock | Payment Method: | Paypal,T/T,Western Union |
| Delivery Method: | DHL, FEDEX, UPS, Etc. | ||
| Highlight: | GE PRO1000 patient monitor grounding wire,patient monitor grounding wire assembly,GE PRO1000 monitor parts with warranty |
||
GE PRO1000 Patient Monitor Grounding Wire Assembly 316696 SBT 00790M 316707 56T 00792M
► Brief Description
The GE PRO1000 Patient Monitor Grounding Wire Assembly, part number 316696 SBT 00790M 316707 56T 00792M, has an outer insulating sheath and metal terminals at both ends. One end is fixed to the grounding terminal on the back of the monitor via a jack, and the other end connects to the equipotential grounding grid or independent grounding stake on the ward wall. Its main function is to establish a low-impedance leakage current discharge path. When the internal insulation of the monitor is damaged or static electricity accumulates, the grounding wire can directly conduct abnormal current to the ground, preventing it from harming the patient or operator, thus triggering the protection device to trip or alarm.
► Specifications
| Model Number | 316696 SBT 00790M 316707 56T 00792M |
| Brand | GE |
| Product Name | Grounding Wire Assembly |
| Condition | Original |
| MOQ | 1 set |
| Delivery Method | DHL ,Fedex ,UPS |
| Payment Method | Paypal,T/T,Western Union |
| Warranty | 90 Days |
| Net Weight | 0.15KG |
| Delivery time | 3-5 Working Days |
| Material | Green |
| Inventory | In stock |
| Use for | GE PRO1000 Patient Monitor |
►Detailed Photos
![]()
►Installation Specifications and Connections
1. Because monitors are often used in frequently moved environments such as emergency rooms and ICUs, the screws or clips on the grounding terminal can easily loosen. It is recommended to gently pull the wire after connection to confirm tightness and prevent increased contact resistance due to vibration.
2.The grounding wire should not be tightly wrapped with power lines or signal lines to reduce the impact of electromagnetic interference on the acquisition of physiological parameters such as ECG and blood oxygen.
►Routine Maintenance
1. Visual Inspection: Focus on checking for cracks or damage to the outer sheath of the wires, and for bending or deformation at the base of the terminals caused by broken cores.
2. Continuity Test: Use a grounding resistance tester to measure the resistance from the monitor's metal casing to the final grounding terminal. According to medical electrical safety standards (such as IEC 60601), the protective grounding resistance should generally be less than 0.1 ohms or 0.2 ohms.
►Why Choose CWT Technology HK Limited.?
1. Enough Stock and Variety: We stock a wide range of used patient monitors, defibrillators, ECG, cables, batteries, SPO2 sensors, probes, and more from various brands (Mindray, Goldway, GE, Zall, Masima, Nihon KONKEN, etc.).
2. Our Engineers Have Over 12 Years of Industry Experience: Whatever problems you encounter, please feel free to contact us. We will provide you with professional service.
3. Convenient Export: Located in Guangzhou, China's largest export city, adjacent to Hong Kong, we enjoy a superior geographical location. Parcels will be delivered within 3-5 business days.
Thank you for your time, if you want to know more about GE PRO1000 Patient Monitor Grounding Wire Assembly 316696, please contact me freely. looking forward to hearing from you.
Contact Person: Mia
Tel: 86-15779588554